Project features

Start:

End:

Jan 2022

Jul 2023

Location:

Client:

Uzbekistan

EBRD

The GoU has launched a 1 GW Wind Program, supported by EBRD for the development of wind power projects under the PPP modality (the Program). The Consultant has already supported phase 1 of the Program, a 100 MW wind power plant in Karakalpakstan, Uzbekistan and currently is supporting further development and implementation of the Second Wind Project (Phase 2) by providing transaction advisory support to the GoU for wind farm project of up to 200 MW. GoU has requested to consider the possibility of coupling the wind farm with battery storage. Juru has performed PFS and FS level BESS studies and is providing transaction advisory during auctions. At PFS stage, BESS size, technology and functions/ application were determined. At the FS stage, further analysis and recommendations for the implementation, operation and concept design of the proposed BESS were provided. Juru’s role extends to full transaction support including BESS transaction structuring, preparation of tender docs, and tendering support until commercial close. 

Services provided

Task 1. BESS technology overview and use case

Task 2. High-level BESS sizing and LCoS computation

  • Type and recommended size of a BESS for collocation with Wind Farm
  • Active power plot development for the cases with and without BESS. 
  • Levelized Cost of Storage (LCoS) computations
  • Value Stacking

Task 3. BESS integration studies

  • BESS and control logic modelling for specific functions/applications
  • Identification of grid code and local parameters/limits related to BESS
  • Power flow study for defining operating strategies of BESS and equipment sizing
  • Short circuit calculation study for equipment sizing
  • Ramp Rate Control Study
  • Environmental and social assessment

Task 4. BESS concept design

  • SLDs for BESS, protection and transmission system
  • BESS plant sizing (collector power transformer, OHTL, BESS inverters and transformers, auxiliary system)
  • Control philosophy and technical specifications for BESS components

Task 5. BESS transaction advisory

  • BESS transaction structuring, preparation of tender docs (PPA’s Technical Schedules, KDD, ItB, Form Sheets) and tendering support until commercial close