Project features
Start:
End:
Dec 2023
Mar 2024
Location:
Client:
Uzbekistan
ACWA Power Global Services Ltd
The Government of Uzbekistan has signed an agreement with the EBRD to partner on the development of large-scale wind power projects up to a total capacity of 2,000 MW in Uzbekistan. Within this agreement, ACWA Power initiated development of a 200MW WPP Project coupled with BESS in the Republic of Karakalpakstan, Uzbekistan. Acwa power awarded Juru as a technical advisor to conduct OHTL route surveys for 220 kV overhead transmission line between Beruni 220 kV substation and Nukus 2 WPP.
Services provided
- Identify 3 feasible corridors for each line route based on a preliminary desktop study including analysis of existing documents, IBAT reports and GIS surveys
- Propose selection of the final route fulfilling the E&S and technical cost-effectiveness criteria
- Estimate tower quantities for the proposed option, OHL route length with conductor, OPGW and shield wire lengths
- Provide Pre-feasibility Study Report
- Develop preliminary Design & Scoping of Beruni 220 kV substation extension including analysis and finalisation of SLD options, electrical layout, protection & control SLD, telecom arrangement, and preliminary specifications for secondary equipment