Project features
Start:
End:
Sep 2024
Ongoing
Location:
Client:
Uzbekistan
LARSEN AND TOUBRO
ACWA Power signed an investment agreement with the MoE and a 25-year PPA with NEGU for the development, construction, and operation of the Samarkand 1&2 Projects, the largest combined solar and battery storage project in Central Asia. Under this agreement, ACWA is responsible for 100 MW, 400 MW, and 500 MW PV areas, a 1,336 MWh BESS, the 500/220 kV grid substation in Nurabad, and a Pooling substation for NEGU.
Services provided
Basic & Detailed engineering design Nurabad GSS 500/220 kV:
- Basic engineering design, BoQ
- Develop design criteria for each discipline, conceptual HVAC, civil & architectural conceptual design
- Protection & Control, Metering, SCADA & telecom network topology & cybersecurity architecture
- Perform short circuit, load flow, HV/LV equipment, DC&UPS and ACSR & cable sizing calculations;
- Preparation of technical specifications & datasheets
- Procurement support:
- Tender technical evaluation including a comparative summary of the requirements requested and offered to facilitate the decision-making process for award from a technical point of view;
- Support during the technical negotiations with the selected bidder.
- Detailed Design and final BoQ including:
- Substation primary electrical engineering, cable tray/trench, HV equipment installation detailed drawings.
- Levelling/Earthwork & drainage system, civil & architectural engineering design.
- Water supply and sewage, HVAC, Firefighting and fire alarm system.
- Develop detail design of cybersecurity and telecommunication systems, CCTV equipment and security.
- Earthing & lightning protection design.
- Development of the Emergency Control Automation (ECA) detailed design.
- Review/Adaptation of the design documentation:
- 100MW/400MW/500MW PV substation & PV area, Pooling substation.
- Design adaptation of SLDs, PSLD, Basic RPA design, General and electrical layout & cross-section drawings, equipment layout drawings;
- Design adaptation of Architectural Drawings of the buildings;
- Design adaptation of foundations& steel structure details of the buildings and HV/MV equipment and gantries;
- Design adaptation of the HVAC, WSS systems, firefighting and fire alarm & detection systems
- BESS-1&2 substation & plant area (2x500MW).
- Design adaptation of SLDs, PSLD, Basic RPA design, General and electrical layout & cross-section drawings, equipment layout drawings;
- Design adaptation of Architectural Drawings of the buildings;
- Design adaptation of foundations& steel structure details of the buildings and HV/MV equipment and gantries;
- Design adaptation of the HVAC, WSS systems, firefighting and fire alarm & detection systems;
- Design adaptation of Cable line from BESS-1 to Nurabad GSS
- Design adaptation of Cable line from BESS-2 to Karakul existing substation.
- Developed Fire Risk Assessment / Fire Safety Design for BESS Plant
- Permitting support:
- Support obtaining final approval on the design documents and support during the technical negotiations from all relevant local authorities for the design & adopted documents.