Project features
Start:
End:
Nov 2021
Sep 2022
Location:
Client:
Uzbekistan
ACWA Power
GoU has launched a program for the development of wind power projects, with support from the EBRD for a capacity of up to 1GW under PPP modality. The first project of the program, a 100 MW wind power plant and associated evacuation infrastructure (“Project”) has been auctioned, which was won by ACWA Power.
The allocated land for this Project is located at a greenfield location in Karatau mountain region between the Beruniy and Qorao’zak district of Karakalpakstan. Key features of the Project:
- 100 MW wind farm [details TBD]
- 220 kV AIS and ca.16 km 220 kV OHTL
- 23 km access road
Services provided
Environmental and Social Impact Assessment (ESIA)
- Baseline report of technical studies, including:
- 24-hours constructional noise monitoring at 4 locations by using sound meter Class1 (Type 1) (IEC 61672);
- 24 hours detailed noise monitoring at 2 locations during 21 days by using sound meter Class1 (Type 1) (IEC 61672);
- Full chemical analysis of soil at Project site and along 15.6 km OHTL;
- Soil contamination assessment at Project site and along 15.6 km of OHTL route;
- Biodiversity surveys, including:
- 7 months of bird surveys along OHTL route;
- Seasonal reptile survey at the Project site and along OHTL;
- Seasonal mammal survey at the Project site and along OHTL;
- Seasonal botanical/habitat survey at the Project site and along OHTL;
- 7 months of bat static detector survey;
- Spring and summer bat roost search.
- Archaeological and cultural heritage study at the Project site and along OHTL;
- Social economic study for the Project site and OHTL, including:
- Creating local communities’ profile by conducting 100 household surveys in three nearest villages;
- Conducting face to face interviews with local land users;
- Development of stakeholder matrix and conducting consultations;
- Preparation of GRM template and support it throughout the ESIA duration;
- Regulatory review.
- Organization of public consultations and disclosure meetings for Project;
- Preparation and submission of Preliminary EIA report to local regulator;
- Support approval of the National EIA Statement;
- Support lead Consultant in submission of ESIA to lenders and addressing their comments.
Resettlement Action Plan / Livelihood Restoration Plan
- Legislation review report for permanent land acquisition and obtaining RoW process in Uzbekistan;
- Conduct socio economic survey of PAPs affected by Project site and OHTL;
- Development of stakeholder matrix and conducting consultations for Project site and districts where OHTL will be constructed;
- Inventory and valuation of property losses at the Project site and along OHTL;
- Calculation of compensation for identified assets;
- Preparation of compensation package for PAPs based on Uzbek and lenders’ requirements;
- Preparation of institutional arrangement e for the implementation and monitoring of the RAP/LRP;
- Information disclosure, consultations and participation.